{"id":127,"date":"2011-08-01T13:11:34","date_gmt":"2011-08-01T07:41:34","guid":{"rendered":"http:\/\/www.rtslink.com\/tally-erp\/?p=127"},"modified":"2011-08-01T13:11:34","modified_gmt":"2011-08-01T07:41:34","slug":"merge-two-ledgers-in-tally-erp-9","status":"publish","type":"post","link":"https:\/\/www.rtslink.com\/tally-erp\/2011\/08\/merge-two-ledgers-in-tally-erp-9\/","title":{"rendered":"Merge two Ledgers in Tally.ERP 9"},"content":{"rendered":"<p><em>How to merge two Ledgers in Tally.ERP ?<\/em><\/p>\n<p><strong>Merging two Ledgers in Tally.ERP 9<\/strong><\/p>\n<p>It is assumed that you have two Ledgers viz &#8220;Ledger 1&#8221; and &#8220;Ledger 2&#8221; and you need to merge the &#8220;Ledger 2&#8221; into &#8220;Ledger 1&#8221; such that all the Vouchers having &#8220;Ledger 2&#8221; would show &#8220;Ledger 1&#8221; after the merge-process.<\/p>\n<p>PS:<br \/>\na) Take backup of your Tally data for safety purpose before trying out the underneath steps.<br \/>\nb) We have tested Merging of two Ledgers with <strong>Tally.ERP 9 Release 3.0<\/strong> only<\/p>\n<p>Step-by-step instructions:-<\/p>\n<ol>\n<li><strong>Change Tally.ERP 9 configuration settings<\/strong><br \/>\na) Select option &#8220;Gateway of Tally &gt;&gt; F12 &gt;&gt; General&#8221;<br \/>\nb) Set the option &#8220;Overwrite Vouchers during Import&#8221; to Yes<\/li>\n<li><strong>Set the period in Tally.ERP 9<\/strong><br \/>\nSelect option &#8220;Gateway of Tally &gt;&gt; Alt+F2&#8221; and set the period. Example if you have vouchers  for three years, set the period accordingly so that the whole data is accessible.<\/li>\n<li><strong>Export Tally.ERP 9 data in XML<\/strong><br \/>\na) Select option &#8220;Gateway of Tally &gt;&gt; Display &gt;&gt; Daybook &gt;&gt; Alt+F2&#8221; and set the full-period<br \/>\nb) Next, export Tally.ERP 9 data using &#8220;Alt+E&#8221; in XML format.<\/li>\n<li><strong>Make changes in XML data<\/strong><br \/>\na) Open the file &#8220;Daybook.xml&#8221; in Notepad and find\/replace all occurrences of the &#8220;Ledger 2&#8221; with &#8220;Ledger 1&#8221;.<br \/>\n<em>Remarks: The file daybook.xml is created in step-3 on exporting data  using Alt+E<\/em><br \/>\nb) Save the Daybook.xml file<\/li>\n<li><strong>Import data in Tally.ERP 9<\/strong><br \/>\na) Select option &#8220;Gateway of Tally &gt;&gt; Import of Data &gt;&gt; Vouchers&#8221;.<br \/>\nb) Specify the file-name (ex: daybook.xml) and press enter to import it.<\/li>\n<li><strong>Verify the Vouchers in Tally.ERP 9<\/strong><br \/>\nSelect option &#8220;Gateway of Tally &gt;&gt; Display &gt;&gt; Daybook&#8221; and check vouchers to verify the merging-process.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>How to merge two Ledgers in Tally.ERP ? Merging two Ledgers in Tally.ERP 9 It is assumed that you have two Ledgers viz &#8220;Ledger 1&#8221; and &#8220;Ledger 2&#8221; and you need to merge the &#8220;Ledger 2&#8221; into &#8220;Ledger 1&#8221; such that all the Vouchers having &#8220;Ledger 2&#8221; would show &#8220;Ledger 1&#8221; after the merge-process. PS:<\/p>\n<div><a class=\"btn-filled btn\" href=\"https:\/\/www.rtslink.com\/tally-erp\/2011\/08\/merge-two-ledgers-in-tally-erp-9\/\" title=\"Merge two Ledgers in Tally.ERP 9\">Read More<\/a><\/div>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,26],"tags":[],"class_list":["post-127","post","type-post","status-publish","format-standard","hentry","category-tally-erp","category-tips-tricks"],"_links":{"self":[{"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/posts\/127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/comments?post=127"}],"version-history":[{"count":4,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/posts\/127\/revisions"}],"predecessor-version":[{"id":131,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/posts\/127\/revisions\/131"}],"wp:attachment":[{"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/media?parent=127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/categories?post=127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rtslink.com\/tally-erp\/wp-json\/wp\/v2\/tags?post=127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}